Three Breaker 115kV Switching Station
This project entailed cutting into an existing 115kV transmission line and installing a three breaker switching station to feed a new utility client. The picture shows the station under construction which was completed in 2008. T&D completely designed the station and provided engineering construction review. The control house is located left of the picture, but the 115kV line that was to be cut can be seen on the right side. The 115kV line to the client’s customer leaves to the left of the picture.